the 10 inch pipes supplied for the main between Pokpolum and Victoria in the year 1860. The cost there quoted corresponds with Moore Wilson's estimate.
I can find no data for the estimate for the 2nd, 3rd, 4th, and 5th item, but observe that the difference between the Messrs Lambert & Sons tender is £19. With regard to the 3 items for Sluice valves, where the largest discrepancy is shown, I feel little doubt that Messrs Tyler & Sons have quite misunderstood what was required.
I may state that the material for the original water supply was procured from Butterley Iron Works in Derbyshire, whose prices would be very much lower than those of a London house.
The 32 Drawings for the Sluice Valves will be prepared forthwith for transmission to England.
I have etc.,
(Signed) Sherman G. Bridges, A.S.G. for the Surveyor General
(True Copy)
Colonial Secretary's Office...
...
Page 3:
the 10 inch pipes supplied for the main between Pokpolum and Victoria in the
year
1860. The cost there quoted corresponds
with Mo?" Wilson's estimate.
I can find
mo
data for the
1.
estimate for the 2nd 3rd 4" and 5° item but
observe that the difference between the
Mefo Lambert +Sons tender is £19. With regard to the 3 items for Sluice
estimate and
valves where the largest discrepancy is shlun
little doubt that Map?? Tyler & Sons have
I feel t
I
quite misunderstood what was
required
Imay state that the material for
the
original Mater supply
was
procured from
The
32
Drawings for the Sluice Valves will be prepared forthwith for transmission to
England.
I have ye
(Signed) Sherman G. Brid a. s. G for the Surveyor General
(True Copy)
Colonial Secretare:-
3:
1 Butterley Iron Work's in Derbyshire whose
prices would be
very
of a London house
much lower than those